Laserfiche WebLink
SUMMIT COUNTY LAND USE AND DEVELOPMENT CODE <br />CHAPTER 10: Areas and Activities of State Interest <br />F. Permit Amendments and Technical Revisions <br />Any change in the construction or operation of the Project from that approved by the BOCC shall require either a <br />"permit amendment" or a "technical revision." A proposed change will be considered a technical revision if the <br />Planning Director determines that there will be no increase in the size of the area affected by the Project or the <br />intensity of impacts of the Project. Provided, however, the Planning Director may determine that even though the <br />proposed change will increase the size of the area affected or the intensity of the impacts, the impact is not <br />significant as described in Section 10200.C.2, so as to warrant a determination of a "technical revision". Changes <br />other than technical revisions are considered permit amendments. <br />is <br />1. Process for Determining if a Permit Change is an Amendment or a Technical Revision <br />a. In order to obtain a Determination of the Level of Permit Amendment Review, the applicant shall first <br />attend a preapplication meeting and submit a request for a Level of Permit Review Determination as <br />described in Section 10200.13 of these Regulations. <br />b. The Determination of Level of Permit Amendment Review shall be made by the Planning Director <br />within a reasonable time (not to exceed 30 days) following the preapplication submittal. <br />c. Within five (5) days of the Determination of Level of Permit Amendment Review, the Planning <br />Director shall provide notification of the determination to (i) the applicant by phone and letter, and (ii) <br />the BOCC, the County Manager and the County Attorney by e-mail and phone. <br />d. A notice of the determination of the level of permit amendment review shall be published in the legal <br />notice section of a legal newspaper of general circulation as soon as practicable. <br />2. Reconsideration of Planning Director's Determination of Level of Permit Amendment Review <br />a. Call-up by the BOCC. The BOCC may, at its discretion, review and amend any determination of the <br />Planning Director at the next regularly scheduled meeting of the BOCC for which proper notice can be <br />accomplished following receipt of the notice of the determination. <br />b. Request for Reconsideration. Within seven (7) days after publication in the legal newspaper of a <br />determination by the Planning Director, any Affected Party may request that the BOCC reconsider the <br />Planning Director's determination at the BOCC's next regularly scheduled meeting for which proper • <br />notice can be accomplished following the request. The BOCC shall review the Determination based on <br />the provisions of Section 10200. <br />3. Permit Amendment Application Submittal Requirements and Process <br />a. Permit Amendments. <br />i. A permit amendment will be reviewed as if it were a new permit application according to these <br />Regulations. <br />b. Technical Revisions. <br />i. To obtain a technical revision, the applicant shall submit the following to the Planning Director: <br />(a). A copy of the current permit. <br />(b). As-built drawings of the project. <br />(c). Drawings and plans of proposed changes to the project. <br />(d). Additional mitigation plans. <br />ii. The Planning Director shall approve the technical revision to the permit if staff does not foresee <br />changes in the intensity of the impacts caused by the proposed activity within 30 days of receipt of <br />request for a technical revision. <br />4. Change in Level of Permit Amendment Review: At any time prior to the final decision on the <br />application for a permit amendment under these Regulations, the County may decide that information <br />received since the preapplication process indicates that the nature and scope of the impacts of the Proposed <br />Project Amendment are such that a different Level of Permit Amendment Review is required. <br />a. If a different level of permit review is required, the Planning Director shall: <br />i. Notify the applicant immediately. <br />ii. Notify the BOCC, the County Manager and the County Attorney. <br />b. A decision by the Planning Director to change the Level of Review shall be subject to the <br />reconsideration provisions in Section 10300.F.2. <br />22 0