Laserfiche WebLink
.i a , a <br />. (3) The Permit is valid only for the construction and operation of the <br />Project described in the application package together with the <br />conditions of approval, if any, imposed by the Permit Authority. <br />(4) A copy of the Permit shall be certified by the Permit Authority and <br />presented to the County Clerk and Recorder for recording in the <br />same manner as any document relating to real property. <br />6.03.12 Permit Amendment. <br />(1) Any change in the construction or operation of a Water and Sewer <br />Project from that approved by the Permit Authority shall require a <br />permit amendment, unless otherwise exempt. <br />(2) A permit amendment will be subject to the following requirements <br />and procedures: <br />(a) Permit Application Submittal Requirements. <br />(i) A copy of the current Permit and reasons for <br />amendment <br />(ii) As-built drawings of the Project, if available. <br />• (iii) Drawings and plans of proposed changes to the <br />Project. <br />(iv) Additional or changed mitigation plans. <br />(v) Statement of need for amendment. <br />(vi) Site Plan. <br />(vii) Vicinity map. <br />(viii) Written report of how amendment satisfies the criteria <br />in sections 6.04.01, 6.04.02 and 6.04.03. <br />(b) Permit Amendment Procedure. <br />(i) The applicant shall meet with the Director to discuss <br />the proposed permit amendment. <br />(ii) Application submittal requirements shall be reviewed <br />by the Director. <br />28