My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-30_HYDROLOGY - M1984036
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1984036
>
2011-03-30_HYDROLOGY - M1984036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:07 PM
Creation date
3/31/2011 10:19:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984036
IBM Index Class Name
HYDROLOGY
Doc Date
3/30/2011
Doc Name
Augmentation & Bonding Info.
From
Varra Companies
To
DRMS
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STATE OF COLORADO <br />WATER DIVISION ONE <br />° <br />OFFICE OF THE STATE ENGINEER <br />Divfslon of Water Resources <br />Department of Natural Resources „ <br />+ <br /> r <br />810 9" Street, Sulte 200 ` s <br />Greeley, Colorado 80631 <br />Phone (970) 352-8712 <br />Fax (970) 392-1816 <br />www.water.state.co.us <br />8711 Owens <br />Governor <br />Greg E. Walcher <br />Exam" DlrecW <br />Hal D. Simpson. RE <br />State Engineer <br />November 28, 2003 <br />Mr. Jay Davenport <br />Lyman Henn, Inc. <br />11016' Street, Suite 900 <br />Denver, CO 80202 <br />Re: Lining of Varra Dakolios Pit <br />SW'/, Section 31, T3N, R67W <br />Water Division 1'. Water District 5 <br />Dear Jay: <br />James R. Hall <br />Division Engineer <br />The purpose of this letter is to approve the lining of the above referenced gravel pit. This <br />approval is based on the site inspection conducted on July 29, 2003 and on the information <br />provided by you under a cover letter dated October 23, 2003. The estimated pit inflows <br />from precipitation and groundwater indicate that this pit has been lined to the design <br />standard referenced in the August 1999 State Engineer Guidelines for Lining Criteria for <br />Gravel Pits. Meeting the design standard requires that all water inflows and outflows <br />for this pond must be accounted for on a monthly basis. <br />Please call me if you have any questions. <br />Varra DakoliosPitLineOK. doc <br />Sincerely, <br />- z w , - <br />David L Nettles, P.E. <br />Assistant Division Engineer <br />CC: Scott Edgar, Water Commissioner <br />Jeff Deatherage, Denver SEO
The URL can be used to link to this page
Your browser does not support the video tag.