Laserfiche WebLink
Loader Worksheet Cont'd Task # 002 Page 2 of 2 <br />Total Travel Time: 0.8771 minutes <br />Total Cycle Time: 1.4021 minutes <br />Load Bucket Canacit <br />Rated Capacity: 5.50 LCY (heaped). <br />Bucket Fill Factor: 0.975 Loose material - uniform aggregates to 1/8" (95-100%) 0.975 <br />Adjusted Capacity: 5.36 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6575 feet <br />Source <br />Altitude Adj: 0.92 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.76 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 2 <br />Loader(s) Total job time <br />Unit cost: $0.667 /LCY <br />229.48 <br />175.23 <br />350.46 <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />42.80 Hours <br />Total job cost: $10,007.00 <br />CIRCES Cost Estimating Software