My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-25_REVISION - M1992066
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992066
>
2011-03-25_REVISION - M1992066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:11:57 PM
Creation date
3/30/2011 1:40:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992066
IBM Index Class Name
REVISION
Doc Date
3/25/2011
Doc Name
Amendment approval & FW request (AM-02)
From
DRMS
To
Duckels Construction, Inc.
Type & Sequence
AM2
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: AM2 Cost summary <br />Site: Hogue/River Pit Permit Action: AM2 Permit/Job#: M1992066 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 3/10/2011 County: Routt <br />User: DMC <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br /> <br />Task <br />Description Form <br />Used Fleet <br />Size Task <br />Hours <br />Cost <br />001 Final grading of pit slopes DOZER 2 31.61 $10,031.56 <br />002 Transport topsoil from stockpiles to pit slopes LOADER 2 42.80 $10,007.00 <br />003 Distribute topsoil over reclaimed slopes DOZER 1 12.33 $1,956.73 <br />004 Revegetate wetland areas REVEGE 1 20.00 $11,229.88 <br />005 Revegetate dryland REVEGE 1 20.00 $9,280.25 <br />006 Mobilize reclamation crew/equipment MOBILIZE 1 2.68 $3,911.58 <br />SUBTOTALS: 129.42 $46,417.00 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $937.62 <br />Performance bond: 1.05 Total = $487.38 <br />Job superintendent: 122.47 Total = $7,171.84 <br />Profit: 10.00 Total = $4,641.70 <br /> TOTAL O & P = $13,238.54 <br />CONTRACT AMOUNT (direct + O & P) = $59,655.54 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 Total = 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 Total = $0.00 <br />Reclamation management and/or administration: 5.00 $2,982.78 <br />CONTINGENCY: 0.00 Total = $0.00 <br /> TOTAL INDIRECT COST = $16,721.32 <br />TOTAL BOND AMOUNT (direct + indirect) = $63,138.32 <br />Rounded to $63,000.00 <br />Abbreviation: None <br />Filename: M066-000
The URL can be used to link to this page
Your browser does not support the video tag.