Laserfiche WebLink
- 01127/2009 10:24 970-562-4453 PCC LLC PAGE 02105 <br />Return by January 27, 2009 at 3:30 P.M, to_ receipt of Addends Nos. <br />is hereby acknowledged <br />Yvonne Brannon <br />Division of Reclamation. Mining and Safety: <br />1313 Sherman ,, #215 <br />Denver, CO 80203 <br />Fax (303) $32-8105 <br />FRUITA MINE MAtlr TENANCIE <br />SOND REVOCATION PROJECT I; III-1981.0 5 <br />PKA-S-1149 <br />810 SCHEDULE <br />ftm De rl 'oil QTY Unit Unit Price Amount <br />1. MobilizactionlDemobilization 1 Job N/A 4 .200. 00 <br /> <br />2. <br />Sediment Pored Maintenance ? <br />1 <br />Job I <br />N/A I <br />$4.250.00 <br />3. Rock Check Dam Construction <br />3a, Roa(Will outsiope Check Danis 1S Each $ 27 /each $4 12 <br />3b, Portal Bench Check patios 5 Each <br />750.00 jeach <br />$ <br />$.3 950.00 <br /> <br /> <br />4. <br />Drainage Channol Repair and <br />Construction I <br /> <br />2 30 <br /> <br />Ln.Pt 1 <br /> <br />$17.0 0 /LF <br /> <br />s4,250.00 <br />5. Portal Repair and Rock Apron 1 Job NIA <br />- <br />$ .800-00 <br />6. Revegetation- fertilizing, seeding, <br />mulchln and grim . in 1 aore <br />1 <br />Acre <br />$ 2 ,-40 0.0 a acre <br />2, 4 0 0.0 0 <br />AddItIonat ftms (if Mquiired) <br /> <br /> <br />? 7. Equipment Rental- Excavator, CAT <br />i 320BL or equivalent sized w/ <br />? minimum 20' reach, turbo t.hargeai <br /> <br />and operator <br /> <br />10 <br /> <br />Moors <br /> <br />$ 63.00 /hr. <br /> <br /> <br />0.00 <br />$5 <br /> <br />8. Provide and install additional rip-rap <br />per s ecs if requited at the nd <br />10. <br />Cy <br />N/A 300.00 <br />$ <br />THIS BID SCHEDULE MUST BE, RETURNED <br />Page 1 of 2 Pages