Laserfiche WebLink
Return by January 27, 2009 at 3:30 P.M. to: Receipt of Addenda Nos. 1 (1- 8 - 0 9 ) <br />is hereby acknowledged <br />Yvonne Brannon <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., #215 <br />Denver, CO 80203 <br />Fax (303) 832-8106 <br />FRUITA MINE MAINTENANCE <br />BOND REVOCATION PROJECT; M-1981-01.5 <br />PKA-9-1149 <br />BID SCHEDULE <br />Item Description QTY Unit Unit Price Amount <br />1. Mobilization/Demobilization 1 Job NIA $ 7,000-00 <br />2. Sediment Pond Maintenance 1 Job N/A $ 8,375.00 <br />3. Rock Check Dam Construction <br />3a. Road/Fill Outslope Check Dams 15 Each $ 3 81 .7 5 /each $ 5,726.25 <br />3b. Portal Bench Check Dams 5 Each $ 381. 75 /each $ 1,908.75 <br /> <br />4. Drainage Channel Repair and <br />Construction <br />250 <br />Ln. Ft <br />$ 36.65 /LF <br />$ 91162.50 <br />5. Portal Repair and Rock Apron 1 Job N/A $ 4 , 9 2 5.2 5 <br />6. Revegetation- fertilizing, seeding, <br />mulching and crimping 1 acre <br />1 <br />Acre <br />$3,550.00 /acre <br />$ 3,550.00 <br />Additional Items (if required) <br /> <br /> <br />7. Equipment Rental- Excavator, CAT <br />320BL or equivalent sized w/ <br />minimum 20' reach, turbo charged <br />and operator <br /> <br />10 <br /> <br />Hours <br /> <br />$ 163.25 /hr. <br /> <br />$ 1,632.50 <br /> <br />8. Provide and install additional rip-rap <br />per specs if required at the and <br />10 <br />CY <br />N/A <br />$ 935.00 <br />THIS BID SCHEDULE MUST BE RETURNED <br />Page 1 of 2 Pages