Laserfiche WebLink
S <br />THE AMERICAN INSTITUTE OF ARCHITECTS <br /> <br />AIA Document A310 <br />Bid Bond <br />KNOW ALL MEN BY THESE PRESENTS, thatwe (Here insert full name and address or legal title of Contractor) <br />Professional Pipeline and Concrete, Inc. <br />806 East Pabor <br />Fruita, CO 81521 <br />as Principal, hereinafter called the Principal, and (Here insert full name and address or legal title of Surety) <br />Westchester Fire Insurance Company <br />1301 Chestnut, TL33B <br />Philadelphia, PA 19103 <br />a corporation duly organized under the laws of the State of Pennsylvania <br />as Surety, hereinafter called the Surety, are held and firmly bound unto (Here insert full name and address or le al One of Owner) <br />State of Colorado, Department,of Natural Resources - Colorado Division of Reclamation & Mining & Safety <br />1313 Sherman Street, Room 215 <br />Denver, Cp 80?03 <br />as Obligee, hereinafter called the Obligee, in the sum of five percent of bid submitted <br />Dollars ($ 5% of bid submitted <br />for the payment of which sum well and truly to be made,* the said Principal and the said Surety, bind ourselves, our. <br />heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. <br />WHEREAS, the Principal has submitted a bid for (Here Insert full name, address and description of pro)ed) <br />Project No.: PKA-9-1149, Fruita Mine Bond Revocation <br />NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee <br />in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents <br />with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material <br />furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or <br />bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said <br />bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said <br />bid, then this obligation shall be null and void, otherwise to remain in full force and effect. <br />Signed and sealed this 22nd day of January <br />(Witness) <br />(Witness) <br />2009 <br />( Professional Pi li a Concrete, Inc. <br />( (Seal) <br />(Title <br />t <br />( Westch ster re Insu a e C__o p -' t <br />ancye J Jordan, Attori•+,n Fa <br />AIA DOCUMENT A3100 BID BOND • AIA ® • FEBRUARY 1970 ED • THE AMERII <br />INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D.C. 2006 <br />9/93