Laserfiche WebLink
EXHIBIT L RECLAMATION COSTS Carrizo Stone, North <br />QTY UNIT COST UNIT COST <br />1. Replace Overburden 15,056 $0.58 LCY $8,732.48 <br />2. Vert. Highwall Reduction 10 $80.00 HOUR $800.00 <br />3. Grass Seed Mix(50%failure) 28 $160.00 ACRE $4,480.00 <br />4. Fertilizer 0 0 0 0 <br />5. Topsoiling(Loader & Box <br />Blade 25% swell) 22,586 $0.58 LCY $13,099.99 <br />6. Scrifying Hard Pan Areas 13,600 $0.04 SQYD $544.00 <br />7. Seedbed Prep& Planting 28 $130.00 ACRE $3,640.00 <br />8. Mulching Hay & Straw 28 $100.00 ACRE $2,800.00 <br />9. Weed Control 28 $35.00 ACRE $980.00 <br />lO.Mobilization&Demobilization 2 $750.00 EACH $1,500.00 <br />TOTAL DIRECT COST $36,576.47 <br />INDIRECT COST OVERHEAD AND PROFIT <br />Public Liability Insurance 1.55% $566.93 <br />Contractor Performance Bond Cost 1.55% $566.93 <br />Contractor Profit 10% $3,657.65 <br />TOTAL PERFORMANCE BOND AMOUNT $41,385.98 <br />Carrizo Stone Sandstone Quarry cost/acre $1,478.07