Laserfiche WebLink
Connell Resources Timnath Pit <br />Spill Prevention Control and Countermeasures Plan <br />Table of Contents <br />Page 2 of 4 <br />Section 7.0 Demonstration Of Impracticability [112.7(d)] 7-1 <br />Section 8.0 Inspections, Tests And Records [40 CFR 112.7(e)] 8-1 <br />Section 9.0 Personnel, Training, And Discharge Prevention Procedures [112.7(f)]9-1 <br />9.1 Training [112.7(f)(1)] .......................................................................................................9-1 <br />9.2 Designated Person [112.7(f)(2)] .....................................................................................9-1 <br />9.3 Briefings [112.7(f)(3)] ......................................................................................................9-1 <br />Section 10.0 Security (Excluding Oil Production Facilities) [112.7(g)] 10-1 <br />10.1 Fencing [112.7(g)(1)] ..................................................................:..................................10-1 <br />10.2 Master Flow and Drain Valves 112.7(g)(2)] ................................................................10-1 <br />10.3 Starter. Controls 112.7(g)(3)] ........................................................................................10-1 <br />10.4 Pipeline Connections 112.7(g)(4)] ...............................................................................10-2 <br />10.5 Facility Lighting 112.7(g)(5)] ........................................................................................10-2 <br />Section 11.0 Facility Tank Car And Tank Truck Loading/Unloading Rack <br />(Excluding Offshore Facilities) [112.7(h)] 11-1 <br />11.1 Loading/Unloading Area Drainage 112.7(h)(1)] .........................................................11-1 <br />11.2 Warning Light or Barrier 112.7(h)(2)] ..........................................................................11-1 <br />11.3 Vehicle Observation 112.7(h)(3)] .................................................................................11-2 <br />Section 12.0 Field-Constructed Aboveground Containers [112.7(i)] 12-1 <br />Section 13.0 Conformance with Applicable Requirements [112.70)] 13-1 <br />Section 14.0 QUALIFIED OIL-FILLED OPERATIONAL EQUIPMENT [112.7(K)] 14-1 <br />14.1 Qualification Criteria - Reportable Discharge History [112.7(k)(1)] ......................... 14-1 <br />14.2 Alternative Requirements to General Secondary Containment [112.7(k)(2)] ......... 14-1 <br />Section 15.0 Other Requirements 15-1 <br />Section 16.0 Facility Drainage [112.8(b)] 16-1 <br />16.1 Diked Area Drainage [112.8(b)(1)] ............................................................................... 16-1 <br />16.2 Diked Area Drainage Valves [112.8(b)(2)] .................................................................. 16-1 <br />16.3 Undiked Area Drainage [112.8(b)(3)] ........................................................................... 16-1 <br />16.4 Discharge Diversion System [112.8(b)(4)]] ................................................................ 16-2 <br />16.5 Treatment System Pumps [112.8(b)(5)] ...................................................................... 16-2 <br />Section 17.0 Bulk Storage Containers [112.8(c)] 17-1 <br />17.1 Compatibility [112.8(c)(1)] ............................................................................................ 17-1 <br />17.2 Secondary Containment [112.8(c)(2)] ..................... :................................................... 17-1 <br />17.3 Diked Area Drainage [112.8(c)(3)] ............................................................................... 17-1 <br />17.4 Buried Metallic Storage Tanks [112.8(c)(4)] ............................................................... 17-1 <br />17.5 Partially Buried or Bunkered Metallic Tanks [112.8(c)(5)] ........................................ 17-2 <br />17.6 Testing [112.8(c)(6)] ...................................................................................................... 17-2 <br />17.7 Internal Heating Coils [112.8(c)(7)] ............................................................................. 17-2