Laserfiche WebLink
Connell Resources Timnath Pit <br />Spill Prevention Control and Countermeasures Plan <br />Revision Date: June 25, 2009 <br />Section 8.0 Inspections, Tests And Records [40 CFR 112.7(e)] <br />Page 8-2 <br />Facility <br /> <br />Component <br />Action <br />Frequency/Circumstances <br /> Observe for deterioration. Whenever a section of buried line is <br />Buried piping <br />exposed for any reason. <br /> <br /> Integrity and leak testing. At the time of installation, modification, <br /> construction, relocation, or replacement. <br />For some of these assessments, blank forms and procedures for completing the form can be <br />found in Appendix C. The assessment forms are signed by the inspector or supervisor and <br />maintained by Connell for three years.