Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Initial bond cost summary <br />Site: Lost Cause Pond Permit Action: Initial Bond <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 3/15/2011 County: Rio Blanco <br />User: DMC <br />Agency or organization name: DBMS <br />TASK LIST (DIRECT COSTS) <br /> <br />Task <br />Description Form <br />Used Fleet <br />Size Task <br />Hours <br />Cost <br />001 Highwall reduction DOZER 1 10.69 $1,696.25 <br />002 Topsoil application DOZER 1 0.72 $114.57 <br />003 Revegetate and slopes REVEGE 1 16.00 $940.04 <br />004 Mobilize reclamation crew/equipment MOBILIZE 1 7.14 $2,886.40 <br />SUBTOTALS: 34.55 $5,637.26 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 0.00 <br />Performance bond: 0.00 <br />Job superintendent: 0.00 <br />Profit: 10.00 <br />Permit/Job#: M2010084 <br />Abbreviation: None <br />Filename: M084-000 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and/or administration: 5.00 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $1,373.78 <br />TOTAL BOND AMOUNT (direct + indirect) = 47,414JW <br />7?00o0 <br />$0.00 <br />$0.00 <br />$0.00 <br />$563.73 <br />$563.73 <br />$6,200.99 <br />Total = 500.00 <br />Total = $0.00 <br />$310.05 <br />