Laserfiche WebLink
Transportation Cycle Time: <br />Mobilization Worksheet Cont'd <br />Task # 004 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Non-Roadable <br />Equipment Roadable <br />Equipment <br />1.29 1.29 <br />1.29 1.29 <br />0.50 NA <br />0.50 NA <br />3.57 2.57 <br />Total job time <br />45.00 miles <br />35.00 mph <br />$2,832.63 <br />$53.77 <br />7.14 Hours <br />Total job cost: $2,886.40 <br />CIRCES Cost Estimating Software <br />Page 2 of 2 <br />MEEKER <br />