Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Topsoil application <br />Site: Lost Cause Pond Permit Action: Initial Bond Permit/Job#: M2010084 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 3/15/2011 County: Rio Blanco <br />User: DMC <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8R Series II - 8U (2005) <br />Horsepower: 310 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $39.08 NA <br />Operating Cost/Hour: $81.13 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.49 NA <br />Total unit Cost/Hour: $158.69 <br />Total Fleet Cost/Hour: $158.69 <br />MATERIAL QUANTITIES <br />Initial Volume: 320 <br />Swell factor: <br />Loose volume: <br />1.000 <br />320 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />200 feet <br />515.8 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />6,450 feet <br />1,600 lbs/LCY <br />Top Soil <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.200 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />CIRCES Cost Estimating Software <br />Abbreviation: None <br />Filename: M084-002 <br />