My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-24_PERMIT FILE - M2010084
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010084
>
2011-03-24_PERMIT FILE - M2010084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:01 PM
Creation date
3/29/2011 9:58:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010084
IBM Index Class Name
PERMIT FILE
Doc Date
3/24/2011
Doc Name
Application decision letter
From
DRMS
To
Lost Cause, LLC
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Initial bond cost summary <br />Site: Lost Cause Pond Permit Action: Initial Bond Permit/Job#: M2010084 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 3/15/2011 County: Rio Blanco <br />User: DMC <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description Form <br />Used Fleet <br />Size Task <br />Hours <br />Cost <br />001 Highwall reduction DOZER 1 10.69 $1,696.25 <br />002 Topsoil application DOZER 1 0.72 $114.57 <br />003 Revegetate and slopes REVEGE 1 16.00 $940.04 <br />004 Mobilize reclamation crew/equipment MOBILIZE 1 7.14 $2,886.40 <br />SUBTOTALS: 34.55 $5,637.26 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 0.00 Total = $0.00 <br />Performance bond: 0.00 Total = $0.00 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $563.73 <br /> TOTAL O & P = $563.73 <br />CONT RACT AMOUNT (direct + O & P) = $6,200.99 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 Total = 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 Total = $0.00 <br />Reclamation management and/or administration: 5.00 $310.05 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $1,373.78 <br />TOTAL BOND AMOUNT (direct + indirect) = -$;,91444 <br />7000.00 <br />Abbreviation: None <br />Filename: M084-000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.