Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 02B <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 (GEN.) <br />1.000 (AVG.) <br />0.830 (1 SHIFT/DAY) <br />0.800 (FND-RF) <br />0.298 (CAT HB) <br />1.000 (CAT HB) <br />0.902 (CAT HB) <br />1.000 (PAT) <br />Net correction: 0.1606 <br />Adjusted unit production: 228.84 LCY/hr <br />Adjusted fleet production: 457.68 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.933/LCY <br />Total job time: 17.80 Hours <br />Total job cost: $7,603.97 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />