Laserfiche WebLink
COST SUMMARY WORK <br />Task description: <br />Site: Whitewater Quarry <br />PROJECT IDENTIFICATION <br />Permit Action: SO-01 <br />Task #: 001 State: Colorado <br />Date: 3/17/2011 County: Mesa <br />User: THM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br /> <br />Task <br />Description Form <br />Used Fleet <br />Size Task <br />Hours <br />Cost <br />Ola Backfill highwall to 3H: IV DOZER 1 5.12 $771.29 <br />02a Replace overburden over pit floor DOZER 1 11.66 $1,757.41 <br />03a Distribute and lace topsoil around regraded areas LOADER 1 20.34 $1,463.00 <br />04a Replace topsoil on disturbed area outside quarry DOZER 1 1.59 $240.12 <br />05a Revegetate 2.6 acres REVEGE 1 8.00 $3,261.34 <br />06a Mob. / Demob. MOBILIZE 1 2.70 $2,518.00 <br />SUBTOTALS: 49.41 $ $10,011.16 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 0.00 Total = $0.00 <br />Performance bond: 0.00 Total = $0.00 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total= $1,001.12 <br /> TOTAL O & P = $1,001.12 <br />CONTRACT AMOUNT (direct + O & P) = $11,012.28 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 Total = 500.00 <br />Engineering work and/or contractibid preparation: 0.00 Total = $0.00 <br />Reclamation management and/or administration: 5.00 $550.61 <br />CONTINGENCY: 0.00 Total = $0.00 <br /> TOTAL INDIRECT COST = $2,051.73 <br />TOTAL BOND AMOUNT (direct + indirect) = $12,062.89 <br />Permit/Job#: M1986002 <br />Abbreviation: None <br />Filename: M002-001