Laserfiche WebLink
Page 1 of 2 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mob. / Demob. <br />Site: Whitewater Quarry Permit Action: SO-01 <br />PROJECT IDENTIFICATION <br />Task #: 06A State: Colorado <br />Date: 3/15/2011 County: Mesa <br />User: THM <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK'TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership Cost/Hour: $16.63 $18.37 $22.33 <br />Operating Cost/Hour: $44.38 $46.13 $50.07 <br />Operator Cost/Hour: $27.66 $27.66 $27.66 <br />Helper Cost/Hour: $0.00 $25.39 $25.39 <br />Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br />Description Unit Cost/hr/ unit Cost/hr/unit Size Cost/hr/ Cost/hr/ fleet Cost/ fleet <br /> (TONS) fleet <br />Cat D7R DS Series 31.25 $43.55 $117.55 1 $161.10 $117.55 1250.00 <br />II - 7SU <br />CAT 914G <br />8.10 <br />$11.24 <br />$88.67 <br />1 <br />$99.91 <br />$88.67 <br />$250.00 <br />DrillBroadcast 25.00 $39.59 $88.67 1 $128.26 $88.67 $250.00 <br />Seeder with Tractor <br />Subtotals: $389.27 1 $294.89 $750.00 <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ unit Fleet Size Haul Trip Return Trip <br />Cost/hr/ fleet Cost/hr/ fleet <br />Subtotals: $0.00 $0.00 <br />Abbreviation: None <br />Filename: M002-06a <br />Permit/Job#: M1986002 <br />CIRCES Cost Estimating Software