Laserfiche WebLink
Loader Worksheet Cont'd Task # 03A Page 2 of 2 <br />Total Travel Time: 0.6985 minutes <br />Total Cycle Time: 1.1635 minutes <br />Load Bucket Cai)acit <br />Rated Capacity: 1.70 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist aggregates (95-100%) 0.975 <br />Adjusted Capacity: 1.66 LCY <br />Job Condition Correction Factors <br />Site Altitude: 4730 feet <br />Source <br />Altitude Adj: 0.97 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.81 multiplier <br />Unadjusted Hourly Unit Production: 85.48 LCY/Hour <br />Adjusted Hourly Unit Production: 68.82 LCY/Hour <br />Adjusted Hourly Fleet Production: 68.82 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Loader(s) <br />Total job time: 20.34 Hours <br />Total job cost: $1,463.00 <br />Unit cost: $1.045 /LCY <br />CIRCES Cost Estimating Software