My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-18_INSPECTION - M2002114
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2002114
>
2011-03-18_INSPECTION - M2002114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:51 PM
Creation date
3/28/2011 11:16:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002114
IBM Index Class Name
INSPECTION
Doc Date
3/18/2011
Doc Name
Inspection report
From
DRMS
To
OldcAstle SW Group, Inc.
Inspection Date
3/1/2011
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: 15 Road Gravel Pit <br />BULLDOZER RIPPING WORK <br />Rip compacted areas prior to topsoiling <br />Permit Action: SI-01 Permit/Job#: M2002114 <br />PROJECT IDENTIFICATION <br />Task #: 04A <br />Date: 3/18/2011 <br />User: THM <br />State: Colorado <br />County: Mesa <br />Agency or organization name: DRMS <br />Seismic: <br />Area: <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8R Series II - 8SU <br />(2005) <br />Ripper Attachment: 1-Shank Ripper <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: M 114-04a <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br /> Utilization % <br />Ownership Cost/Hour: $46.62 NA <br />Operating Cost/Hour: $87.10 100 <br />Ripper Operating Cost/Hour: $9.52 100 <br />Operator Cost/Hour: $38.49 NA <br />Total Unit Cost/Hour: $181.72 <br />Total Fleet Cost/Hour: $363.45 <br /> <br />MATERIAL QUANTITIES Selected estim ating method: Area <br />Alternate Methods: <br />NA Bank Volume: NA BCY <br />Area: <br />71 acres Rip Depth (ft): 1.50 <br />Source of estimated quantity: Reclamtion Plan <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: NA <br />feet/second <br />Average Ripping Depth: 1.50 mph <br />Average Ripping Width: 5.56 degrees <br />Average Ripping Length: 150.00 feet <br />Average Dozer Speed: 88.00 feet <br />Average Maneuver Time: 0.25 feet <br />Production per unit area: 0.588 acres/hour <br /> <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.588 Acres/hr <br /> <br />Site Altitude: 4,400 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 0.49 Acres/hr <br />Adjusted Hourly Fleet Production: 0.98 Acres/hr <br /> <br />JOB TIME AND COST <br />Fleet size: 2 Grader(s) Total job time: 73.18 <br />Unit cost: $372.513 Per acre Total job cost: $26,598.00 <br />CIRCES Cost Estimating Software <br />Volume: 172,788 BCY or CCY <br />Hours <br />NA
The URL can be used to link to this page
Your browser does not support the video tag.