Laserfiche WebLink
b. The cubic yard values for stockpiles 17 and 18 do not match the values in the chart <br />on the map. <br />4. Annual Reclamation Report, Acres Seeded - The acreage values for `Last Years <br />Cumulative Total' needs to correspond to the 2007 `Cumulative Total' of 452.32 acres. <br />Please update `Last Years Cumulative Total." <br />5. Annual Reclamation Report, Acres Seeded - The acreage values for '10 Years or less' and <br />"Greater than 10 years' do not add up to the "Cumulative Total.' This may be due to a <br />seeded area that is now greater than 10 years since seeding, augmented seeding or a typo. <br />If augmented seeding was necessary, please give a description of the seeding. <br />6. Topsoil Thickness, page 2 - The text states "The New Horizon 2 has a minimum <br />requirement of "...approximately 1.0 foot for topsoil laydown thickness." (2.05.4(2)(d)- <br />13)." The permit does not make reference to a minimum thickness on the stated page <br />number. Please reference the correct page that states a minimum topsoil depth. <br />7. Topsoil Thickness, page 2 - The text states "New Horizon 2 has many different soil <br />thickness requirements as shown on Map 2.05.4-4..." Map 2.05.4-4 shows that in all <br />blocks the first lift will be .83 foot and the second lift will be 1.0 foot. It is unclear by <br />looking at Map2.05.4-4 the variable topsoil thickness described in the 2008 ARR. Please <br />explain. <br />2