Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 005 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost <br />* * one round trip, no haul rig. <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />IDAHO SPRINGS, <br />COLORADO <br />1.00 miles <br />45.00 mph <br />$712.07 <br />$0.00 <br />Non-Roadable <br />Equipment Roadable <br /> <br />Equipment <br />0.02 0.02 <br />0.02 0.02 <br />0.50 NA <br />0.50 NA <br />1.04 0.04 <br />Total job time: <br />Total job cost: <br />2.09 Hours <br />$712.07 <br />CIRCES Cost Estimating Software