My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-23_PERMIT FILE - P2011001
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011001
>
2011-03-23_PERMIT FILE - P2011001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:00 PM
Creation date
3/25/2011 10:44:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011001
IBM Index Class Name
PERMIT FILE
Doc Date
3/23/2011
Doc Name
NOI Approval and FW Request
From
DRMS
To
Empress Gold Mining and Milling, Inc.
Email Name
JLE
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Cost Summary <br />Site: Stanley Mine Permit Action: Application <br />PROJECT IDENTIFICATION <br />Task #: 007 State: Colorado <br />Date: 3/17/2011 County: Clear Creek <br />User: JLE <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: P2011001 <br />Abbreviation: None <br />Filename: P001-007 <br />Task <br />Description Form <br />Used Fleet <br />Size Task <br />Hours <br />Cost <br />001 Plugging and Abandoning drill holes BOREHOLE 1 102.00 $15,888.23 <br />002 Load and carry ore from waste it to adit LOADER 1 2.69 $202.00 <br />003 Haul in and fill dump pit with clean <br />material/to soil NA 1 0.10 $3,200.00 <br />004 Revegetation of 1600 square feet REVEGE 1 0.00 $57.21 <br />005 Mobilization and De-mobilization of Loader MOBILIZE 1 2.08 $712.07 <br />006 Mobilize and Demobilize Drill Rig MOBILIZE 1 33.53 $4,533.57 <br />SUBTOTALS: 140.4 $ $24,593.08 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $496.78 <br />Performance bond: 1.05 Total = $258.23 <br />Job superintendent: 70.20 Total = $4,110.91 <br />Profit: 10.00 Total = $2,459.31 <br /> TOTAL O & P = $7,325.23 <br /> CONTRACT AMOUNT (direct + O & P) = $31,918.31 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 4.25 Total = $1,356.53 <br />Reclamation management and/or administration: 5.00 $1,595.92 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 ?-- <br /> <br /> TOTAL INDIRECT COST = $10,277.67 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $34,870.75
The URL can be used to link to this page
Your browser does not support the video tag.