Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 006 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />SOUTH JORDAN, <br />UTAH <br />480.00 miles <br />65.00 mph <br />$4,533.57 <br />$0.00 <br />Non-Roadable <br />Equipment Roadable <br />Equipment <br />7.38 7.38 <br />7.38 7.38 <br />1.00 NA <br />1.00 NA <br />16.77 14.77 <br />Total job time: 33.54 Hours <br />Total job cost: $4,533.57 <br />CIRCES Cost Estimating Software