Laserfiche WebLink
PETERS PIT <br />MINING PLAN <br />Pit depth 15-20 ft <br />I <br />The topsoil will be removed by a dozer and loader with 1240 inches <br />of overburden & topsoil moved as needed from West to East. When <br />reclaiming the old pit, the stockpile will be removed as needed out of <br />the working area. In the middle of the pit, gravel will be pushed in a <br />pile with a Loader and then loaded on trucks. <br />O <br />I <br />41 7 <br />D OSWALD <br />/ - /9- 020// <br /> <br />?r <br /> <br />EXHIBIT C <br />