Laserfiche WebLink
Phase 1 work will include grading of the lower portion of the diversion channel <br />• to reduce the overall flow gradient and establish the permanent diversion <br />configuration, and installation of gabion mats or other appropriate channel <br />protection materials to minimize channel erosion and control flow velocities. <br />Phase 2 and 3 work, to be completed prior to final site reclamation, will involve <br />grading remaining upgradient portions of the Magpie Creek diversion channel <br />to establish the permanent diversion configuration and placement of erosion <br />control mats or similar materials along with selective revegetation. <br />Reclamation of the GEC mine area adjacent to the lower portion of Magpie <br />Creek diversion was completed in 1994 by the DMG/Inactive Miners Program. <br />This reclamation may impact the diversion in the section between the GEC <br />West Pit drainage channel and the GEC 8-foot road culvert. Under agreement <br />with DMG (letter dated 11 /28/951, EFCI will not be subject to enforcement <br />actions for impacts due to reclamation of the GEC Mine. Enforcement actions <br />will not be issued if it can be shown that the GEC reclamation is the sole <br />source of a compliance problem and EFCI has diligently pursued its <br />maintenance obligations. <br />• <br />C:\880\TR33 <br />oare,ree oz:e,.m w, 2.05.3-49a flevised -January 1996 <br />