Laserfiche WebLink
EFCI has established standardized procedures which are periodically <br />. reviewed with surface operators for controlling inflows to and discharge <br />from both Ponds No. 2 and 3. These procedures limit maximum water level <br />in these ponds and serve to ensure a continuous supply of water for coal <br />processing and other consumptive uses. As part of EfCI's comprehensive <br />hydrologic control program, duration and flows for discharge operations <br />are <br /> <br /> <br />C:\WORK\PRAE6VdM~R IS REV <br />p.p1,YJ lmm 2.05.3-45Ra Revised April 1993 <br />