Laserfiche WebLink
During refuse pile construction, active working area will be.sloped and oriented to <br />provide effective drainage from the surface of each completed lift. If necessary, <br />temporary ditches will be established in working areas to collect and route runoff <br />from the refuse pile and immediately adjacent areas to perimeter collection ditches. <br /> <br />2.05.3 - 35a Revised 3/26/97 <br />. Technical Revision No. 27 <br />