My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-08_PERMIT FILE - C1980007
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-10-08_PERMIT FILE - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:25:03 PM
Creation date
3/24/2011 1:44:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
10/8/2010
Doc Name
CIRCES Cost
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : CDRMS <br />Permit or other job action : Regrade mud pits associated with MR-242- 24- <br />Task description :Replace topsoil from stockpile to access roads associated with MR <br />..................................................................................................................................................................................... <br />HOURLY E U""1PMENT COST :::::::...................................................................................................................................................................................... <br />Q <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />Cat D9R - 9SU (2005) <br />Semi-Universal <br />ROPS Cab <br />3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> (CRG) <br />Data source: <br /> - <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />Operating cost/hour : $98.84 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br />_:...: _ <br />MATERIAL QUANTITIES ...:::: ::::.::::::::::::::::. :::::::: <br />Initial Swell Loose <br />volume : 1,186 CCY factor : 1.125 volume : 1,334 LCY <br />Source of estimated volume: Division estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 75 feet <br />Unadjusted hourly production : 1,514.3 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Drv packed <br />15.00 % (neg) <br />6,600 feet <br />Z550 Ibs/LCY <br />Job Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shiff1da) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 1.33 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.60 <br />Adjusted unit production : 903.68 LCY/hr <br />Adjusted fleet production : 3,614.71 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 0.37 Hours <br />Unit cost : $0.226 /LCY Total job cost : $302
The URL can be used to link to this page
Your browser does not support the video tag.