Laserfiche WebLink
Agency or organization name : CDRMS <br />Permit or other job action : Regrade mud pits associated with MR-212 <br />Task description :Remove and replace topsoil to remove water pipe from MR-209 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROBS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />Ownership cost/hour <br />Operating cost/hour <br />Ripper op. cost/hour <br />Operator cost/hour <br />Total unit cost/hour <br />Swell <br />factor <br />Utilization % <br />$72.92 NA <br />$98.84 100 <br />$0.00 0 <br />$32.78 NA <br />$204.53 Total fleet cost/hour : $81 <br />Loose <br />1.250 volume : 795 LCY <br /> <br /> <br /> <br /> <br /> 8.13 <br />volume : 636 BCY <br />Source of estimated volume :Division estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />: <br />URLY PRODUCTION ............. <br /> <br />HO <br />.................... <br />......................................::,:Condition Correction Factors :.::: <br /> <br />Job o <br /> <br />...... <br />. .. ........ <br />...................... .... .. <br /> <br />......... <br />.............::::.:r:«::::..... <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted rill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.40 <br />Weight description <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Unit cost : $0.240 /LCY <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost