Laserfiche WebLink
Agency or organization name : CDRMS <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Regrade SGFA dewatering facility structures <br />::.: .. <br />EQUIPMENT COST ...................... ......... <br />HOURLY <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br /> <br />MATERIAL QUANTITIES ........................... <br />Initial Swell Loose <br />volume : 15,000 BCY factor : 1.330 volume : 19,950 LCY <br /> <br />Source of estimated volume : Table 2 <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 546.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted rill or embankment Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.79 (Cat HB) <br />Average push gradient : 10.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,800 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.28 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Adjusted unit production <br />Adjusted fleet production <br />152.65 <br />610.59 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 32.67 Hours <br />Unit cost : $1.340 /LCY Total job cost : $26,731