Laserfiche WebLink
Colowyo Coal Company <br />2010Annual Reclamation and Hydrology Report <br />• Figure 7-1- West Pit Fill Quarterly Inspection Reports Continued <br />INSPECTION REPORT a WEST PIT FILL <br />INDICATE QUARTER 1sT 2ND 3RD 4TH ® 2010 <br />YEAR <br />-ALL QUARTERS NEED TO BE CERTIFIED* <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No X Yes <br />If yes, explain: <br />Date of Survey: 10/11/2010 <br />Reviewed By: Jerry Magas & Tom Peterson <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No X Yes Measured Level 82.4 ft. <br />If yes, explain: <br />Date of Measurement: 11/12/2010 <br />Measured By: T. Peterson <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No X Yes <br />If yes, explain: <br />• Date of P.E. Inspection: 11/12/2010 <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 11/12/2010 <br />Inspected By: T. Peterson <br />???? p0 L I CF ?Gi? <br />r. PCN P ?t i <br />% <br />So ? `? .off <br />V <br />R>2257 • a <br />?.° <br />Signed: ' <br />Date: 17?l2•? f o ???<,?;/ON <br />nAI <br />???inrr11111 ?• <br />T P M.E. o. 3225RSON <br />Reference Permit •- Volume 5-B, Exhibit 19, Page I a-4 <br />CF: HSEQ 24.20 Revised March 7, 2006 <br />0 <br />Inspected By: T. Peterson <br />Page 7-6