Laserfiche WebLink
colowyo coal company <br />2010Annual Reclamation and Hydrology Report <br />Figure 3-1- Completed CDRMS Annual Reclamation Report Form <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2010.- <br />61060 yo e-4-19el -d!q Gikv ?O 60/a'-j <br />min name permit # Permittee <br />Address: 5731 S4a(e 11iu?tt ?lv 13 Mecl u a 816"11 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total t <br />Acres disturbed y 7 56 , 5 + 2o, = q777,-%" <br /> <br />Acres backfilled and graded <br />1751 <br />+ <br />'9U , -lam <br />-r, r <br />Acres to soiled 1700, 25 97,40 - 1797. 65 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each cateaorv below. Do not include acres that have achieved final. Phase III release. <br />0 <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less ears' <br />Acres seeded' 1'760.:Z51 .1 87-140 = 11797-65 = 587.96 + 11,79-49 <br />"include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed y777 3W and the total number of acres: <br />Phase I released Z - 3?t Phase II released 92o, 3g Phase III released f- <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed U . ?Q <br />For Government Performance and Results Act t' <br />Acreage in long-term mining or reclamation facilities 2 q{ o' to <br />Acreage in active mining areas 3 L_4 15. 1 <br />I(exclude acres where Phase III release has been achieved) <br />' Includes haul and access roads; temporary dams and Impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackrilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />' Includes pits, topsoil stripped areas In advance of pits, and spoil not backrilled and graded <br />• <br />Page 3-2