Laserfiche WebLink
SEDCAD 4 for Windows <br />Cnnv.inhr 10OR -9M7 D -1. I Qrh,..h <br />G <br />w/o Freeboard w/ Freeboard <br />Hydraulic Radius: 0.293 ft <br />Froude Number: 0.92 <br />Structure #1 (Pond, <br />NSSA Pond <br />Pond Inputs: <br />Initial Pool Elev: <br />6,075.40 ft <br />Initial Pool: <br />0.17 ac -ft <br />*Sediment Storage: <br />0.01 ac -ft <br />Dead Space: <br />20.00% <br />*Sediment capacity based on A verage Annual R of 20.0 for 2 year(s) <br />Straight Pipe <br />Barrel Barrel <br />6,075.91 ft <br />H'graph Detention Time: <br />Entrance Tailwater <br />Pond Model: <br />Barrel Manning's <br />Spillway <br />0.78 days <br />Diameter Length <br />78.30% <br />0.000 <br />Loss Depth <br />6,074.00 0.090 <br />Slope ( %) n <br />Elev (ft) <br />(in) (ft) <br />Coefficient (ft) <br />6.00 35.00 <br />10.00 j 0.0110 <br />6,075.401 <br />0.50 0.00 <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />6,076.70 15.00 2.50:1 2.50:1 5.00 <br />Pond Results: <br />Peak Elevation: <br />6,075.91 ft <br />H'graph Detention Time: <br />2.20 hrs <br />Pond Model: <br />CSTRS <br />Dewater Time: <br />0.78 days <br />Trap Efficiency: <br />78.30% <br />Dewatenng time is calculated from peak stage to lowest spillway <br />Elevation - Capacity - Discharge Table <br />Area <br />Capacity <br />Discharge Dewater <br />Elevation <br />Time <br />(ac) <br />(ac -ft) <br />(cfs) (hrs) <br />6,073.55 0.031 <br />0.000 <br />0.000 Top of Sed. Storage <br />6,074.00 0.090 <br />0.026 <br />0.000 <br />Filename: NSSA.sc4 Printed 10 -16 -2008 <br />