Laserfiche WebLink
SEDCAD 4 for Windows <br />r.....,�,.ti� loop _onm D -1s i <br />20 <br />0 -1 <br />Culvert Inputs: <br />Culvert Results: <br />Max. Tailwater Entrance <br />Length (ft) Slope ( %) Manning's n Headwater () ft Loss Coef. <br />(ft) (Ke) <br />52.00 5.00 0.0240 3.00 0.00 0.90 <br />Design Discharge = 14.34 cfs <br />Minimum pipe diameter: 1 - 21 inch pipe(s) required <br />Structure #2 (Culvert <br />O -1B <br />Culvert Inputs: <br />Culvert Results: <br />• <br />Structure #1(Pond� <br />MS -3 <br />Pond Inputs: <br />Design Discharge = 0.10 cfs <br />Minimum pipe diameter: 1 - 4 inch pipe(s) required <br />Initial Pool Elev: <br />6,058.10 ft <br />Initial Pool: <br />0.73 ac -ft <br />*Sediment Storage: <br />0.01 ac -ft <br />Dead Space: <br />0.00 <br />Max. Tailwater Entrance <br />Length (ft) Slope ( %) Manning's n Headwater Loss Coef. <br />(ft) (ft) (Ke) <br />53.00 5.00 0.0120 1.50 0.00 0.90 <br />*Sediment capacity based on A verage Annual R of 30.0 for 3 year(s) <br />Straight Pipe <br />Barrel Barrel <br />Entrance Tailwater <br />Barrel <br />Manning's Spillway <br />Diameter Length <br />Loss Depth <br />Slope ( %) <br />n Elev (ft) <br />(in) (ft) <br />Coefficient (ft) <br />6.00 185.00 10.271 <br />0.0140 6,058.10 <br />0.70 0.00 <br />Emergency Spillway <br />is <br />Filename: MB -3.sc4 Printed 09 -30 -2010 <br />