In May 2007, HGTI placed a 12-foot by 60-foot mobile trailer (approved under MR-15) adjacent <br />to the office/change building trailer to house additional offices. This trailer is~ <br />insulated, electrically heated, lighted and ventilated. It will not have a water or sewage <br />system. <br />A passenger car parking area is provided at the office building complex. A new, gravel- <br />surfaced parking area will be constructed at the truck loading building. However, the <br />parking area at the loadout building will be within the existing disturbance boundary and <br />will not increase the disturbed area. <br />Wastewater and Stormwater Facilities <br />There is an existing septic system that is used to collect all wastewater from the <br />office/change house trailer. The location of the septic system is shown on Exhibit 12-2, <br />Surface Water Control Plan Map (see both Revision 5, TR-04 Incidental Permit Boundary <br />Change, dated 8/99, or Revision 11, MR-15, dated 03/07). Storm water runoff from the <br />facilities area is accumulated in the two sedimentation ponds. The sediment ponds are <br />permitted with Colorado Water Quality Control Division under Colorado Discharge Permit <br />System Permit No. COG-850008 (see Tab 13). <br />Power Transmission <br />Power transmission facilities entering the permit area is owned by Yampa Valley Electric <br />Association (YVEA). The electrical substation adjacent to the office complex is also owned <br />by YVEA. The transmission line easement agreement and substation warranty deed are <br />presented in Tab 3. Power transmission facilities are shown on Exhibit 12-1, Facilities Map <br />(see both Revision 9, TR-04 Incidental Permit Boundary Change, dated 8/99, or Revision 14, <br />MR-15, dated 03/07). <br />• <br /> <br />MR-16 20 Revised 11/07 <br />