Laserfiche WebLink
TABLE 12-3 <br />FACILITIES SUMMARY <br />(continued) <br />Structure ID Description Dimension Unit <br />New Structures: COAL HANDLING SYSTEM <br />NC-010 Rail Car Positioner and Hopper <br /> concrete foundation walls (12"x392LFx2') 584 LF <br /> building superstructure (24'x172'x20') 82,560 CF <br />NC-011 Rail Car Dump Hopper Reclaim Tunnel <br /> concrete floor (24'x140') 3360 SF <br /> concrete foundation walls (2'x328LFx16') 5248 LF <br /> reclaim tunnel 60" belt conveyor 120 LF <br />NC-012 Dump hopper belt conveyor CMP tunnel 16'x106' diameter <br />NC-013 Dump hopper belt conveyor 146 LF <br />NC-014 Radial stacker <br /> radial stacker pad (29'x125') 3625 SF <br /> radial stacker boom 140 LF <br />NC-015 FogJet system control building (16'x12') 192 SF <br /> <br />New Structures: TRANSPORTATION <br />NT-003 Haulroad HGLF-HR2 861 LF <br /> <br />New Structures: DRAINAGE CONTROL <br />NDC-013 Culverts LFC-6, -6A, -7 and -7a 24"x284 LF <br /> <br />Existing Structures: DEMOLITION <br />ED-001 Conical stack tube <br />steel 8'x65' diameter <br />ED-002 Stacker rec laim tunnel <br /> concrete floor (44'x68.5') 3014 SF <br /> concrete foundation walls (12"x225LFx16') 3600 LF <br /> reclaim tunnel 60" belt conveyor 53.5 LF <br /> belt conveyor CMP tunnel 10'x79' diameter <br />ED-004 Crusher belt conveyor (W-103) 210 LF <br />ED-005 Crusher and bag house units 93 CY <br /> <br />Existing Structures: ANCILLARY FACILITIES <br />Office/Change Building mobile trailer (original office) 1950 <br />Office Building mobile trailer (permitted under MR-15) 720 SF <br />SF <br />ID Codes: "EC" -existing coal handling; "ET" -existing transportation; <br />"ECD" -existing drainage control; "ER" -existing and relocated <br />"NC" -new coal handling; "NT" -new transportation <br />"NDC" -new drainage control; "ED" -existing scheduled for demolition <br />Units: LF -linear feet; SF -square feet - ;CF -cubic feet; AC -acre <br />J <br /> <br />• <br />MR-16 18 Revised 11/07 <br />