Laserfiche WebLink
cull, ix M61 bdenum Climax Mine <br />V Hwy. 91 <br />1 Climax, CO 80429 <br />A Freeport-McMoRan Company Phone (719) 486-2150 <br />Fax (719) 486-2251 <br />?s <br />March 18, 2011 <br />RECEIVED <br />Mr. Eric Scott 49AR 2 2 2011 <br />Environmental Protection Specialist <br />Colorado Division of Reclamation Mining and Safety Division OT Kam' <br />1313 Sherman Street; Room 215 Mining and SdetY <br />Denver, CO 80203 <br />Re: Technical Revision #017; Robinson Lake Process Water Reclaim Pipeline <br />Permit #M-77-493 - Climax Molybdenum Company, Climax Mine, Climax, Colorado <br />Dear Mr. Scott: <br />In the next several weeks, Climax Molybdenum Company, Climax Mine (Climax) would like to <br />begin construction of the Robinson Lake reclaim water pipeline,, that will be used to convey process <br />water from Robinson Lake to the mill storage tank when mining and milling operations resume. <br />This project was originally approved in 2007 as part of the Climax Restart Project under Technical <br />Revision (TR) #014. Since that time, several design changes have occurred to the reclaim pipeline. <br />TR-17 is being submitted for you review and approval of those design changes. <br />Enclosed are two copies of TR-17, responses to preliminary comments on the project provided to <br />Climax by the Division, and the $1,006.00 fee applicable to a 112d operation. Please feel free to <br />contact me at 719-486-7584 if you need any additional information. Thank you for considering our <br />request for approval of TR-17. <br />Sincerely, <br />Raymond Lazuk <br />Environmental Manager <br />enc. <br />