My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-21_GENERAL DOCUMENTS - C1982057
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982057
>
2011-03-21_GENERAL DOCUMENTS - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:53 PM
Creation date
3/22/2011 2:48:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
General Documents
Doc Date
3/21/2011
Doc Name
Proposed Decision & Findings of Compliance for SL3
From
Phase I
Permit Index Doc Type
Findings
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost EstimatinaSoftware <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 115 State : Colorado PermiUob# : C-82-057 <br />Date : 18-Mar-2011 County : Routt Abbreviation :none <br />User : JRS Site : Seneca li-W Mine Filename : C057-115 <br />Permitting action : Partial Phase I Bond Release SL-03 <br />Task description : Demolish and Remove All Structures - RELEASABLE AMOUNT <br />UNIT COSTS Last unit cost update : January, 2001 Location adjustment : 99.30% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />Remove All Culverts (per page 25-1-23) <br />-12" Culverts 12 x120LF Pipe, CMP - 12 in. diam. 120.00 LF $8.8640 $1,063.68 <br />-18" Culverts 18"x360LF Pipe, CMP - 18 in. diam. 360.00 LF $10.5391 $3,794.07 <br />-24" Culverts 24"xl190LF Pipe, CMP-24 in. diam. 1,190.00 LF $13.8562 $16,488.82 <br />-30" Culverts 30"x250LF Pipe, CMP - 30 in. diam. 250.00 LF $24.0452 $6,011.31 <br />-36" Culverts 36"x703LF Pipe, CMP - 36 in. diam. 703.00 LF $24.2763 $17,066.27 <br />42"Culverts 42"x120LF Pipe, CMP-42 in. diam. 120.00 LF $28.1100 $3,373.20 <br />-48" Culverts 48 x420LF Pipe, CMP - 48 in. diam. 420.00 LF $31.9380 $13,413.98 <br /> <br />-72"Culverts 72 x160LF Pipe, CMP- 72 in. diam. 160.00 LF $58.3805 $9,340.88 <br />-108"Culverts 108 x240LF Pipe, CMP- 108 in. diam. 240.00 LF $126.5398 $30,369.55 <br /> <br />Shop Area <br />-Bath House Superstructure 55xl2x10' Demo./disp./existing pd - 1OK' haul 6,600.00 CF $0.1249 $824.27 <br />_ <br />-Bath House Floor 55x12x6" Demo./disp. exs. pit, 6" th.- 10K ft. 660.00 SF $1.5921 $1,050.75 <br /> <br />-Vehicle Maintenance Shop Superstructure 100'x40'x25' Demo./disp./existing pit - 1OK' haul 100,000.00 CF $0.1249 $12,488.88 <br />-Vehicle Maintenance Shop Floor 100x40'x4" Demo./disp. exs. pit, 4" th.- 10K ft 4,000.00 SF $1.0614 $4,245.47 <br />-Vehicle Maintenance Shop Footing 280LF Demo./disp. exs. pit, 1x2'- 10K ft. 280.00 LF $6.3682 $1,783.10 <br /> <br />-Well House Superstructure 13xl2x8' Demo./disp./existing pit - 10K' haul 1,248.00 CF $0.1249 $155.86 <br />-Well House Floor 13x12'x4" Demo./disp. exs. pit, 4" th.- 10K ff. 156.00 SF $1.0614 $165.57 <br /> <br />Miscellaneous <br /> <br />-Remove Power Lines 4.4 Miles Power/phone line - single pole 23,232.00 LF $2.0600 $47,857.92 <br /> <br />-Remove Diesel Fuel Tanks (3) 10,000 Gallons Exc.Aoad, non4eaking-9K-12Kgal. 3.00 EA $782.0000 $2,346.00 <br />-Remove Sludge from Tank Bottom 10,000 Gallons Remove contents - 9K-12K gal. 3.00 EA $250.5000 $751.50 <br />-Add C02 for Tank Cleaning 10, 000 Gallons Insert dry ice - 1.5 lbs.1100 gal. 450.00 LB $1.5700 $706.50 <br />-Dispose of Tank Sludge Assume 1,500 Gallons Off-site sludge disposal - Avg. 1,500.00 GAL $3.3300 $4,995.00 <br />-Transport Tank to Approved Storage Facility 10, 000 Gallons Haul to cert. dump - 9K-12K gal. 3.00 EA $875.0000 $Z625.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $180,918 Total Cost (adjusted for location): X179,651
The URL can be used to link to this page
Your browser does not support the video tag.