My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-21_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2011-03-21_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:56 PM
Creation date
3/22/2011 7:35:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
REVISION
Doc Date
3/21/2011
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Sage Creek Coal Company, LLC
Type & Sequence
TR1
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMMARY OF REVISION/ADDITIONS <br />INSERTION INSTRUCTIONS <br />Sage Creek Coal Company <br />Peabody Sage Creek Mine (C-2009-087) <br />Technical Revision TR01 <br />December 2010 <br />Vol. 1A - Rule 2.05 <br />• 2.05.2 Operation Plan - LOM Area replace entire text section <br />• 2.05.3 Operations Plan - Permit Area replace entire text section <br />• 2.05.4 Reclamation Plan replace page 2.05-39 <br />• 2.05.6(3) Protection of Hydrologic Balance replace page 2.05-87 <br />Vol. 3A - Exhibit 2.05.3-E2 <br />• Drainage and Sediment Control Plan replace entire text section <br />• Appendix 2.05.3-E2.A, Addendum 2.05.3-E2.A-1 <br />10-yr, 24-hr SEDCAD Demonstration replace entire section <br />• Appendix 2.05.3-E2.A, Addendum 2.05.3-E2.A-2 <br />25-yr, 24-hr SEDCAD Demonstration replace entire section <br />• Attachment 2.05.3-E2.D, Addendum 2.05.3-E2.D-3 <br />Combination Spillway Channel Design remove from Appendix 2.05.3- <br />E2.D <br />Vol. 313 - Exhibit 2.05.3-E2 <br />• Appendix 2.05.3-E2.E, <br />Coal Stockpile Sump Design Report replace with attached E2-E, <br />Sump Design Report <br />• Appendix 2.05.3-E2.G-2, South Facilities Area <br />Operational Ditch and Culvert Design replace entire section <br />Vol. 3C - Exhibit 2.05.3-E2 <br />• Map 2.05.3-E2.D, PECOCO Pond <br />Spillway Redesign replace with PECOCO Pond As- <br />Built Map (Map 7-18A) <br />• Map 2.05.3-E2.D, Upper Sump replace with E2.E1, Upper Sump <br />Vol. 3C - Exhibit 3.02.2-E1 <br />0 Estimated Cost Estimate insert TR-1 cost estimate
The URL can be used to link to this page
Your browser does not support the video tag.