My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-21_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2011-03-21_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:56 PM
Creation date
3/22/2011 7:35:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
REVISION
Doc Date
3/21/2011
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Sage Creek Coal Company, LLC
Type & Sequence
TR1
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />C O L O R <br />N DO <br />Denver, Colorado 80203 o <br />p <br />Phone: (303) 866-3567 RECLAMATION <br />FAX: (303) 832-8106 MINING <br /> <br /> SAFETY <br />John W. Hickenlooper <br />Governor <br />March 21, 2011 <br />Mike King <br />Executive Director <br />Scott Cowman Loretta E. Pineda <br />Sage Creek Coal Company, LLC Director <br />29515 Routt County Road 27 <br />Oak Creek, CO 80467 <br />Re: Peabody Sage Creek Mine (Permit No. C-2009-087) <br />Proposed Decision - Technical Revision No. I (TR-1) <br />Portal Area Facility Modification <br />Dear Mr. Cowman: <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for Technical <br />Revision No. 1 at the Peabody Sage Creek Mine. Notice of the proposed decision will be published in the <br />Steamboat Pilot as soon as possible. The first publication will initiate the ten (10) day public comment <br />period for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. This Technical Revision must not be implemented until this <br />proposed decision becomes final and until any required increase in bond is submitted to and approved by <br />the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />Jason D. Musick <br />Environmental Protection Specialist <br />Enclosure <br />cc: Carl Johnston, Office of Surface Mining, with enclosures <br />C-TR-06 C2009087 ]DM 03212011090714.doc <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.