Laserfiche WebLink
March 14,2011 C-1982-056/Foidel Creek Mine 1DM <br /> c.,RA _- <br /> I.aT, <br /> r-•. <br /> Initial develo ment of the erosion with material collected and no roadside ditch established. <br /> Gully erosion from Truck loadout access road down the North Slope of the Pond B access road and to Foidel Creek <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Comolete Inspections this Fiscal Year: 3 <br /> Page 9 of 14 <br />