My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-21_HYDROLOGY - C1981014
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981014
>
2011-03-21_HYDROLOGY - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:53 PM
Creation date
3/21/2011 9:46:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
HYDROLOGY
Doc Date
3/21/2011
Doc Name
1st Quarter 2011 Pond Inspection Report
From
Energy Fuels Coal, Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspect
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENERGY FUELS COAL, INC. - SOUTHFIELD MINE - PERMIT NO. C-81-014 <br />PO BOX 459 -115 EAST MAIN ST <br />FLORENCE, CO 81226 <br />SEDIMENTATION POND INSPECTION FORM <br />Pmdx w 6-r?0u/e ? ?©/ NPDES No. f? <br />Date of Inspection <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: <br />2, Erosion foaming gullies, <br />llcnt, 14ioderau Few, <br />Exflettsive, Some, <br />Verv Few, <br />3 is wave action causing erosion. <br />On the upstream embaakmeat' <br />At the pr ocipal spillway inlet? <br />4. Erosion of the downstream toe of the en6aakm m? <br />The cause of the erosion is attributed to* <br />5. is seepage occurring throusb the darn? Yes No <br />Ca N alit st qmp cause potential instability? Yes No= <br />Explain: -- <br />PRINCIPAL SPILLWAY <br />1. Is the principal spiRwati system in worlung order' Yes ?_ No <br />2. Is the inlet free of debris and restricuve matenal^ (S EE BACI(- Yes No <br />3. Is the discharge outlet free of resuicrive material? /i /; Yes NO-- <br />4. is erosion occurring at the discharge outlet' <br />Evaluate the severity- <br />Extensive :Moderate <br />Yes ?IO )( <br />Just Starting None <br />EMERGENCY SPILLWAY <br />! Is the overall cmagem spillway system capaL.e of passing design storm discharge? <br />Yes X No <br />2. Does it appear as rf the emergency spillway has discharged water since the tsar irtspeetion? x <br />Yes No <br />3. Is erosion occattsing at any WCWn of the etoergency spillway? Yes <br />Describe the extent: <br />SEDHWENT STORAGE CAPACITY <br />1. Has the detagn storage capacity of the reservoir been aarpasse Yes No X <br />If yes. explain: <br />Please add arty special comments eoneernlnf poteotiUly daup. probkm as the back of thh <br />sbm! -6: -'- F-:? f? 0 inspected by: -- <br />0-kc <br />Yes <br />Yes <br />Yes <br />Poor <br />Now <br />Nol- <br />No <br />No f_
The URL can be used to link to this page
Your browser does not support the video tag.