My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-15_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-03-15_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:10 PM
Creation date
3/21/2011 8:41:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
3/15/2011
Doc Name
Preliminary addequacy issues (CN-01)
From
DRMS
To
R Squared Incorporated
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I? I <br />% INSTALLATION GUIDELINES <br />FOR LANDLOKlb TRMS AN.D PYRAMAT® HPTRMs <br />BEFORE YOU BEGIN • <br />Thank you for purchasing high quality Landlok* Turf Reinforcement Mats (TRMs) and Pyramatm High <br />Performance Turf Reinforcement Mats (HPTRMs) from Propex, We're committed to offering the best <br />erosion control products in the industry. <br />It is important to follow these installation guidelines for a successful project. (Note: Construction shall <br />be performed in accordance with the specific project bid documents, construction drawings, and <br />specifications.) In addition, we suggest that a pre-installation meeting be held with the construction <br />team and a representative from Propex. This meeting shall be scheduled by the contractor with at least <br />two weeks notice. Also, Propex suggests that installation monitoring of our TRMs and HPTRMs be <br />performed by a qualified independent third party. <br />SITE PREPARATION <br />1 Grade and compact area of TRM/HPTRM Installation as directed and approved by Engineer. Subgrade shall be uniform <br />and smooth. Remove all rocks, clods, vegetation or other objects so the installed mat will have direct contact with <br />sail surface. <br />? Prepare seedbed by loosening the top 2-3 in (5075 mm) minimum of soil. <br />? Incorporate amendments such as lime and fertilizer and/or wet the soil, if needed, <br />/ Do not mulch areas where mat is to be placed, <br />SEEDING <br />? Apply seed to soil surface before installing mat. Disturbed areas shall be reseeded, <br />? When soil filling, first install the mat, apply seed and then soil-fill per guidelines (seepage 8). <br />? Consult project plans and/or specifications for seed types and application rates. - <br />PR-iiPEX <br />GEOSYNrHETICS <br />I THE ADVANTAGE CREATORS-
The URL can be used to link to this page
Your browser does not support the video tag.