My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-15_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-03-15_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:10 PM
Creation date
3/21/2011 8:41:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
3/15/2011
Doc Name
Preliminary addequacy issues (CN-01)
From
DRMS
To
R Squared Incorporated
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Wally Erickson 3 August 2, 2009 <br />Second Review of Access Road Construction File No-, M-2006-069 <br />2. The condition of the retaining timbers and cable, particularly the extreme angle of a formerly upright <br />timber that was embedded 14 feet into the fill, indicate substantial movement of the fill slope since <br />the time of coastmetion. The "As-Build Report" describes mitigation actions but does not provide an <br />analysis of the cause or extent of the instability or the ability of the suggested mitigation to prevent <br />further movement. Such an analysis must be provided for DRMS review. <br />Wildcat Mining must commit to executing the following list of recommendations contained in "As Build <br />Report" and provide a schedule for their completion. All activities trust be confined to areas for which <br />Wildcat Mining has legal right to enter. <br />1. Tree planting to occur in 2010. Wildcat Mining must provide a tree planting plan for DRMS review <br />and approval to be executed if DRMS approves the road. <br />2. Place straw bales at the bottom of the slope along the intersection of the slope with chain link fence to <br />stop loose soil and rock from migrating into the wetlands. This must be done as soon as possible. <br />3. The rock that has moved into the wetlands must be broken up and removed by manpower, not <br />equipment. This must be done as soon as possible. <br />4. All silt fence needs to be repaired, and damaged straw bales be replaced. This must be done as soon <br />as possible. <br />5. The pipe culvert that was installed at station 5+00 needs to be cleaned of debris and a metal grating <br />installed on the upstream inlet of the pipe. The inlet structure shown in Sakura Engineering drawings <br />must be installed. This must be done as soon as possible. <br />6. Provide a sampling and analysis plan for the pond at the toe of the road fill for DRMS review. This <br />must be done as soon as possible. <br />7. Complete final grading, road base, drainage structure and bar ditch. These items may not commence <br />until approval from DFtMS to proceed through issuance of a mined land reclamation permit that <br />includes the road. <br />8. The upside of the road at station 4+40 to 4+60 has loose trees on the top of the slope. They need to <br />be removed and the slope cleaned of loose rock. The vegetation/trees must be removed by hand not <br />powered equipment. This must be done as soon as possible. <br />9. The silt fence on the entrance mad at station 0+00 needs to be repaired and waddles installed on the <br />west side of the silt fence. This must be done as soon as possible. <br />10. All cribbing must be inspected for loose cables and slipped notches. A report of the inspection must <br />be provided to DRMS. This must be done as soon as possible. If and when a mined land reclamation <br />permit that includes the road is issued, areas of concern must be re-excavated, repaired and new fill <br />placed in the excavated voids. The material or new fill must be 3-inch minus well graded with no <br />vegetation in the fill. Compaction must be in excess of 95 percent modified proctor. A geotechnical <br />engineer must oversee the work and provide written certification to DRMS of correct execution, <br />including meeting the compaction specification. <br />11. In the "As-Build Report" Sakura Engineering states the relation of the floodplain to the toe of the fill <br />slope can be field verified using EDM survey equipment and further states that drawings illustrating <br />the relationship could be prepared. This must be done as soon as possible. <br />12. Upon completion of construction of the road, if it is approved by DBMS, As-Built Drawings must be <br />submitted to DRMS.
The URL can be used to link to this page
Your browser does not support the video tag.