Laserfiche WebLink
'Reclamation Plan <br />ufLt?enoperation nSAll <br />All reclamation isihin a60 dayseafterucompletiunitn? <br />end will be completed w <br />processing equipment and structures will be removed.from the property after <br />cumpleLiu?, of the operation. <br />The non-saleable waste lin a rripprapecoone will e nfigurationpandesloped aseto <br />existing intermediate benches <br />insure no material. sluffing into the South Fork of the Platte River. The <br />placc <br />non-saleable waste materiail from <br />area of phase one. When a 9 is <br />and sloped to a maximum gradlenL of 3:1. <br />The existing roads will be left Iafte mincing. Allumpond areas will be filled <br />4nd or graded to the correct slope ga 3:1 slope. <br />As no top soil or vegetation exists currently o?i Lhe property, no re-soiling <br />or re-vegetation is required. The physical characteristics of the surface <br />are ?tuL c:ondusive to punt growth.