My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-15_REPORT - M1982112
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1982112
>
2011-03-15_REPORT - M1982112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:30:33 AM
Creation date
3/21/2011 7:55:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982112
IBM Index Class Name
REPORT
Doc Date
3/15/2011
Doc Name
Annual Fee/Report/Map
From
Rick Hunt
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Sheets <br />2011 Annual Report <br />Miller Gravel Pit <br />M-1982-112 <br />Schmidt Construction Company <br />Anniversary Date: March 11 <br />Overview of Permit Year: During the 2010/2011 operating year there was little activity at this site as the <br />demand for products produced by this operation remain very low. However, some additional land was affected. <br />Annual Report Maps: The annual report map provided this year shows the condition of the site in early <br />March. About 1.5 acres of additional disturbance was created on the south end of the operation to provide <br />materials for a small project. The actual extraction was in a small pit about 1/3 the size of the red filled object <br />shown as "Pit" on the map. Virtually no other mining occurred at the site as most of the sales were made from <br />existing stockpiles. <br />Affected Lands: The amount of affected land in the last year increased by about 1.53 acres. All of that <br />additional disturbance was within the pre-amendment area. No additional disturbances occurred within the <br />amendment area. <br />Revegetation: No additional reclamation work was done in the last year as everything is caught up. <br />Work Anticipated in 2011/2012: It is hoped that demand for product will finally increase in the next year, but <br />that is dependent on the economy. Product demand remains very low. <br />Schmidt Construction 2011 Annual Report M-1988-112 Miller Gravel Pit Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.