Laserfiche WebLink
q- & c>W1lliny o7nc. <br />C?,mprcss ?nln <br />1330 OSB 9'' 33t <br />6Danon (5D& <br />, 6DO 81212 <br />719-29 038.3 <br />H wempressminirr cem <br />March 14, 2011 <br />Mr. Jared Ebert <br />Division of Reclamation <br />1313 Sherman St., Ste. 215 <br />Denver,. Colorado 80203 _ <br />RE: NOI Review # 3 <br />Dear Mr. Ebert: <br />We want to thank you and your associates for taking time to come out to the mine and for providing copies <br />of your findings. We hope our response to the latest review will allow us to move forward. <br />Operations and Reclamation Measures <br />1. The concrete cap will be ten feet. <br />2. The drill holes will be completely filled with the bentonite with a ten foot concrete cap. <br />3. & 4. We still intend to construct the concrete impoundment. The top of the walls will be held down <br />two feet below existing grade. Once our prospecting is completed and we haven't received our <br />mining permit, we will remove stored material and place them back into adit. The impoundment will <br />then be filled with clean fill material with a twelve-inch topsoil cap, which will bring everything to <br />present area grade. All areas of disturbance will be scarified down 8 inches and then planted. (See <br />attached plans) <br />We will be more than happy to provide driller information once we select one. We assume the adit wont be <br />cleaned out and all safety issues addressed until about November or December. We will then put the work <br />out for bids and once we have made our selection we will provide DRMS with the name-address-phone and <br />project managers name. <br />We appreciate your cooperation in this matter. <br />Sincerely, <br />a/ /,- <br />Robert Fabrizio <br />President / CEO