Laserfiche WebLink
Permanent Impoundment Review Checklist <br />Impoundment: Stock tanks A-F, M, and L in SL-5 Phase III bond release area <br />Mine: Colowyo Coal Mine <br />Permit No.: C-81-019 <br />Document where demonstration is located: TR-89 submittal <br />Intended use of impoundment: Livestock and wildlife watering <br />Date review completed: March 17, 2011 <br />CDRMS reviewer: Tom Kaldenbach <br />jK <br /> <br />Demonstrations required by Section Demonstra <br />-tion <br />adequate ? <br />Yes / No <br />Comment <br />2.05.5(1)(b) The description shall be <br />accompanied by a copy of the comments <br />concerning the proposed use by the legal or <br />equitable owner of record of the surface of the The submittal contains a letter from the landowner indicating the landowner's <br />proposed permit area and the State and local Yes desire to have the stock tanks remain as permanent features on the reclaimed <br /> <br />government agencies which would have to initiate, land. <br />implement, approve, or authorize the proposed use <br />of the land following reclamation. <br /> <br /> <br /> <br /> <br /> <br /> 4) <br />1 O <br /> <br /> <br />h <br />S <br />C