Laserfiche WebLink
Requested Phase 3 New Horizon Mine Areas <br />Phase 3 Description Property Acreage Date of Post-Mine Comments <br />2009 Permit Owners for This Reclam-ation Land Use <br />Areas Release <br />1 Reclaimed San Miguel 95.0 Topsoiled Irrigated Southeast corner <br /> irrigated Power; 1994, 1995, Pasture of New Horizon <br /> Pasture Benson <br />south; 1996, 1997, #2 Mines <br /> 1998 <br /> Goforth <br /> Seeded: <br /> 1994, 1995, <br /> 1996, 1997, <br /> 1998 <br />2 Reclaimed Staats; 26.9 Topsoiled: Irrigated Southeast corner <br /> irrigated WFC 1994, 1995, Pasture of New Horizon <br /> Pasture 1996 #2 Mines <br /> Seeded: <br /> 1994, 1995, <br /> 1996.1998 <br />3 Reclaimed Moore 4.2 Topsoiled: Irrigated Southeast corner <br /> irrigated 1995 Pasture of New Horizon <br /> Pasture #2 Mines <br /> Seeded: 1995 <br />4 Reclaimed Goforth; 23.8 Topsoiled: Dryland Southeast corner <br /> dryland Benson; 1994, 1995 Pasture of New Horizon <br /> Pasture Moore #2 Mines <br /> Seeded: <br /> 1994,1995,1 <br /> 996. <br /> Totals <br />i <br />1 <br />149.9 <br />See Map R-1 and R-2 for details of these areas. <br />SL-12 COMPARISON 16MARll.wpd 11